FARM BIOGAS PLANT IN PŁASZCZYCA
Installation start-up date:
April 21, 2008
Main facilities of the biogas plant:
- 2 primary tanks with the capacity of 300m3
- Component tank with the capacity of 300m3
- Digestion tank with the capacity of 1500m3
- Post-digestion tank with the capacity of 2000m3
- Technical facility
- Technical shelter
- Fire-fighting tank
Basic biogas plant specifications:
- Liquid manure input – 18 500 tons/year
- Maize silage input – 3 700 tons/year
- Plant waste input – 1 000 tons/year
- Herbal product processing waste input –
500 tons/year
- Combined heating and power station with the electric power of 625kW and thermal power of 692 kW
- Heating boiler with the thermal power of 600 kW.
Annual output if the biogas plant:
- Biogas approximately 2 300 000 m3/year
- Electric power approximately 5 300 000 kWh/year
- Thermal energy approximately 5 900 000 kWh/year