FARM BIOGAS PLANT IN PAWŁOWKO
Installation start-up date:
June 9, 2005
Main facilities of the biogas plant:
- Raw material reception station
- Primary tank with pumping station
- 2 digestion tanks
- Technical facility with hygienisation unit
- Post-digestion tank
Basic biogas plant specifications:
- Liquid manure input – 29 000 tons/year
- Maize silage input – 5 500 tons/year
- Slaughter waste input – 3 000 tons/year
- Glycerine input – 1 000 tons/year
- Total capacity of digestion chambers – 1500m 3
- 2 combined heating and power stations with the electric power of 230kW and 495 kW
- Gas boiler with the thermal power of 350 kW
Annual output if the biogas plant:
- Biogas approximately 1 500 000 m3
- Electric power approximately 3 000 000 kWh/year
- Thermal energy approximately 3 900 000 kWh/year